SINGAPORE (Dec 20): SG HSR, a wholly-owned subsidiary of Singapore’s Land Transport Authority (LTA), and MyHSR Corporation of Malaysia have called a joint tender for a private-financed assets company (AssetsCo) to work on the Kuala Lumpur-Singapore High Speed Rail (HSR) project.

Under the tender requirements, the contracted AssetsCo will be responsible for designing, building, financing and maintaining all rolling stock, as well as the designing, building, financing, operating and maintaining all rail assets – such as track work, power, signalling and telecommunications – for the KL-SG HSR project.  

It will also be responsible for coordinating the system’s HSR network capacity for operations and maintenance needs, adds LTA.

To continue reading,

Sign in to access this Premium article.

Subscription entitlements:

Less than $9 per month
3 Simultaneous logins across all devices
Unlimited access to latest and premium articles
Bonus unlimited access to online articles and virtual newspaper on The Edge Malaysia (single login)

Related Stories

Stay updated with Singapore corporate news stories for FREE

Follow our Telegram | Facebook