Continue reading this on our app for a better experience

Open in App
Floating Button
Home News Aviation & Engineering

Changi's Terminal 2 to be re-opened in stages in tandem with air travel recovery

The Edge Singapore
The Edge Singapore • 2 min read
Changi's Terminal 2 to be re-opened in stages in tandem with air travel recovery
Passenger traffic has reached more than 40% of pre-Covid levels / Photo: Samuel Isaac Chua
Font Resizer
Share to Whatsapp
Share to Facebook
Share to LinkedIn
Scroll to top
Follow us on Facebook and join our Telegram channel for the latest updates.

Changi Airport’s Terminal 2 will re-open progressively starting from May 29, ahead of the pick-up in passenger volume, says the Changi Airport Group.

Terminal 2 has been shut since May 2020, when air traffic collapsed because of the pandemic. It was put through a major refurbishment, which will increase its annual handling capacity by 5 million to 28 million when fully completed come 2024.

Terminals 1 and 3 remain in business, while Terminal 4, the budget terminal, is similarly shut like Terminal 2.

This month, the level of air passenger traffic handled in Singapore has hit above 40% - more than double the just under 20% level seen in March.

“CAG is encouraged to see the strong pickup in travel demand and has worked closely with our partners to bring forward the progressive reopening of T2 ahead of the June travel peak to meet this demand,” says Tan Lye Teck, CAG’s executive vice president of airport management.

“The start of flight operations at T2 will provide more capacity to support our airline partners, who are also gearing up to serve more passengers in the months ahead. T2 will reopen in phases over the next two years to support Changi’s recovery as a regional air hub,” he adds.

See also: SIA to adjust conversion prices of 1.625% convertible bonds due 2025 after interim dividend

According to the CAG on May 22, T2 will host mainly peak-hour arrival flights of airlines operating in Terminal 3.

A small number of T3 departure flights may use boarding gates at T2 although passengers on these flights will continue to check in and clear departure immigration at T3.

On May 17, the government has also announced the construction work on Terminal 5, which has been suspended, will resume in around two to three years’ time.

×
The Edge Singapore
Download The Edge Singapore App
Google playApple store play
Keep updated
Follow our social media
© 2024 The Edge Publishing Pte Ltd. All rights reserved.